Factors Affecting the Satisfaction of Post-Disaster Resettlers in the Long Term: A Case Study on the Resettlement Sites of Tsunami-Affected Communities in Sri Lanka

Jagath Manjula Arunakumara Manatunge, Udya Abeysinghe

Abstract


The 2004 tsunami is one of the most devastating natural disasters the world has experienced in the recent past, and it is imperative that we learn from this experience about how to effectively implement post-disaster housing projects. Relatively little research has been conducted to study the level of satisfaction of affected persons in the long term after receiving houses in new settlements with ‘better’ socio-economic and physical facilities. The post-disaster resettlement schemes established in Sri Lanka provide an ideal setting to study the factors affecting long-term satisfaction of communities in the context of providing permanent housing. The present study focused on 12 such sites in Sri Lanka. The elements/criteria chosen to assess the long-term satisfaction of the resettlers consisted of factors related to site selection, the design of dwelling units and surroundings, material well-being and provision of services and infrastructure, aspects related to social factors and perceptions regarding the resettlement process, neighbourhood and social interactions. From the observations of this study, it can be concluded that despite the availability of sufficient funding, the opportunities to plan, design and implement sustainable community-responsive resettlement programmes for tsunami affected households were largely missed. Overall, it was noted that the resettled communities included in the present study are not satisfied in the long-term due to various physical, environmental and socio-economic factors. Particularly inappropriate site selection and design of functional spaces, poor construction of houses and common spaces, and inconvenient access to social infrastructure assets were factors that need more attention in planning resettlement housing.


Full Text:

PDF

References


Asian Development Bank. (2005). Sri Lanka: Post-Tsunami Recovery Program: Preliminary Damage and Needs Assessment. Manila: Asian Development Bank.

Barakat, S. (2003). Housing Reconstruction after Conflict and Disaster.Humanitarian Policy Group, Network Papers 43, 1-40.

Bartolomé, L. J., De Wet, C., Mander, H., & Nagraj, V. K. (2000). Displacement, resettlement, rehabilitation, reparation and development. WCD Thematic Review, 1. The World Commission of Dams.

Benson, C., & Twigg, J. (2007). Tools for Mainstreaming Disaster Risk Reduction: Guidance Notes for Development Organizations. Geneva: International Federation of Red Cross and Red Crescent Societies.

Bilau, A. A., Witt, E., & Lill, I. (2015). A Framework for Managing Post-disaster Housing Reconstruction, Procedia Economics and Finance, 21, 313–320

Birkmann, J., & Fernando, N. (2008).Measuring revealed and emergent vulnerabilities of coastal communities to tsunami in Sri Lanka.Disasters, 32(1), 82–104.

Cernea, M. (2000). Risks, safeguards, and reconstruction: A model for population displacement and resettlement. Economic and Political Weekly, 35(41), 3659–3678.

Cernea, M. (1995). Understanding and preventing impoverishment from displacement: Reflections on the state of knowledge. Journal of Refugee Studies, 8(3), 245–264.

Davidson, C. H., Johnson, C., Lizarralde, G., Dikmen, N., & Sliwinski, A. (2007).Truths and Myths about Community Participation in Post-Disaster Housing Projects.Habitat International, 31(1), 100–115

Delaney, P., & Shrader, E. (2000). Gender and Post-Disaster Reconstruction: The Case of Hurricane Mitch in Honduras and Nicaragua. Draft Report. Washington, DC: The World Bank.

Dias, N. T., Keraminiyage, K., & De Silva, K. K. (2016). Long-term satisfaction of post disaster resettled communities: The case of post tsunami - Sri Lanka. Disaster Prevention and Management: An International Journal, 25(5), 581–594.

Duyne Barenstein, J. (2012). Towards sustainable post-disaster housing and building technologies. Issues and challenges with special reference to India. In: J.C. Bolay, M. Schmid, G. Tejada & E. Hazboun (Eds.), Technologies and Innovations for Development: Scientific Cooperation for a Sustainable Future. Paris: Springer-Verlag, pp. 102–34.

FEMA (2017).Social Impacts of Disaster – Federal Emergency Management Agency. Retrieved from https://training.fema.gov/hiedu/docs/fem/chapter%206%20%20hazard%20 (accessed on 7 January 2017).

Grewal, M. K. (2006). Approaches to Equity in Post-Tsunami Assistance. Sri Lanka: A Case Study. Department of International Development, London and Office of the UN Secretary General’s Special Envoy for Tsunami Recovery. Retrieved from http://www.alnap.org/pool/files/ApproachestoEquity.pdf (accessed on 6 October 2016).

Gunawardena, A., & Wickramasinghe, K. (2010). Targeting and Distribution of Post-Tsunami Aid in Sri Lanka: A Critical Appraisal, SANDEE Working Paper No. 55 – 10, Kathmandu: South Asian Network for Development and Environmental Economics (SANDEE).

Jayasuriya, S., Steele, P., & Weerakoon, D. (2006). Post-tsunami recovery: issues and challenges in Sri Lanka, ADBI Research Paper Series No. 71.Tokyo: Asian Development Bank Institute.

Kusky, T. M. (2003). Geological hazards: A Sourcebook, Greenwood Press, Westport, CT.

Manatunge, J., Nakayama, M., & Contreras-Moreno, N. (2001).Securing ownership in aquaculture development by alternative technology: Acase study of the Saguling Reservoir, West Java. International Journal of Water Resources Development, 17(4), 61–631.

Manatunge, J., Takesada, N., Miyata, S., & Herath, L. I. (2009). Livelihood rebuilding of dam-affected communities: Case studies from Sri Lanka and Indonesia. International Journal of Water Resources Development, 25(3), 479–489.

Manatunge, J., & Takesada, N. (2013a). Long-term perceptions of project-affected persons: A case study of the Kotmale Dam in Sri Lanka, International Journal of Water Resources Development, 29(1), 87–100.

Manatunge, J., & Takesada, N. (2013b). Long-term perceptions of project-affected persons: A case study of the Kotmale Dam in Sri Lanka. In: M. Nakayama & R. Fujikura (Eds.), Restoring Communities Resettled After Dam Construction in Asia (Routledge Special Issues on Water Policy and Governance), Oxford: Taylor and Francis, pp. 78-89.

Miyata, S., & Manatunge, J. (2004). Knowledge sharing and other decision factors influencing adoption of aquaculture in Indonesia. International Journal of Water Resources Development, 20(4), 523–536.

Mubarak, K. (2007). Analyzing Post-Tsunami Livelihoods Recovery: the case of Masons in Polhena Village, Sri Lanka, SSEE Research Paper No. 2, Melbourne: University of Melbourne.

Mulligan, M., & Shaw, J. (2007). What the world can learn from Sri Lanka's post-tsunami experiences, International Journal of Asia Pacific Studies, 3(2), 65–91.

NHDA. (National Housing Development Authority). (2005).Guidelines for housing development in coastal Sri Lanka, Ministry of Housing and Construction, Colombo.

Oliver-Smith, A. (2007). Successes and failures in post-disaster resettlement, Disasters, 15(1), 12–23.

Ophiyandri, T. (2011). Community-based post-disaster housing reconstruction: examples from Indonesia, In: Amarathunga, D. and Haigh, R. (Eds.), Post-Disaster Reconstruction of the Built Environment: Rebuilding for Resilience. Retrieved from http://onlinelibrary.wiley.com/book/10. 1002/9781444344943.

Perera, T., Weerasoori, I., & Karunarathne, H. (2013). An evaluation of success and failures in Hambantota, Siribopura Resettlement Housing Program: Lessons Learned, Sri Lanka Journal of Real Estate, 6, 1–15.

Ratnayake, R. M. G. D., & Rameezdeen R.(2008). A comparative study of donor driven vs. owner driven post disaster housing reconstruction. Proceedings of the CIB International Conference on Building Education and Research, held from 11-15 February, 2008 at Kandalama, Sri Lanka. pp. 192.

Reconstruction and Development Authority (RADA) (2007). Mid-year Review: Post-tsunami Recovery and Reconstruction, RADA, Colombo.

Scudder, T., & Colson, E. (1982). From welfare to development: A conceptual framework for the analysis of dislocated people, In: A. Hansen & A. Oliver-Smith (Eds.), Involuntary Migration and Resettlement: The problems and responses of dislocated people, 267–87. Boulder, USA: Westview Press.

Seneviratne, A. D. (2015). Comprehensive guideline for sustainable involuntary resettlement – special case study on problematic tsunami resettlement sites in Galle district, MSc Thesis submitted to University of Moratuwa, Sri Lanka.

Shaw, J., & Ahmed, I. (2010). Design and Delivery of Post-disaster Housing Resettlement Programs: Case Studies from Sri Lanka and India. Report 6. Monash Asia Institute, Melbourne: Monash University.

TAFREN. (2005). Housing and township development: Assistance policy and implementation guidelines. Colombo: TAFREN.

Takesada, N., Manatunge, J., & Herath, I. L. (2008). Resettler choices and long-term consequences of involuntary resettlement caused by construction of Kotmale Dam in Sri Lanka. Lake & Reservoirs Management, 13(3), 245–254.

Thiruppugazh, V. (2011). When people are involved. In: M. Aquilino (Ed.), Beyond Shelter. Architecture and Human Dignity. New York: Metropolis Press, 70–82.

UoM. (2006). Rapid Environmental Assessment (REA) on Tsunami Permanent Housing Sites in Sri Lanka. Unpublished Report, Moratuwa: University of Moratuwa, Sri Lanka.

Uyangoda, J. (2005). Post-Tsunami Recovery in Sri Lanka, Polity, 2(3). Social Scientists’ Association of Sri Lanka, Colombo.

Weerakoon, D., Jayasuriya, S., Arunatilake, N., & Steele, P. (2007). Economic Challenges of Post-Tsunami Reconstruction in Sri Lanka. Colombo: Institute of Policy Studies.




DOI: https://doi.org/10.5296/jad.v3i1.10604

Refbacks

  • There are currently no refbacks.




Copyright (c) 2017 Journal of Asian Development



Journal of Asian Development  ISSN 2377-9594   E-mail: jad@macrothink.org

Copyright © Macrothink Institute 

To make sure that you can receive messages from us, please add the 'macrothink.org' domains to your e-mail 'safe list'. If you do not receive e-mail in your 'inbox', please check your 'spam' or 'junk' folder.