Who is Responsible for Decision-making in Participatory Development? – Lessons Learned from the Social Reconstruction Plan for the Nam Theun 2 Dam Project
Abstract
The livelihood reconstruction plan implemented in villages affected by the Nam Theun 2 Dam has been facing the limited sustainability of resource use and increasing economic and social disparity among the 16 relocated villages. The objective of this paper is to describe the problems that arose despite a carefully planned resettlement scheme, which included the participation of the residents from affected villages. Issues can be categorized into three types, based on whether risks were identified before decision-making and whether appropriate mitigation measures were considered for the identified risks. Local consensus may not be in agreement with development goals, and the issues that can be addressed by local consultation are limited. Therefore, whether to use local consultation or not should be considered carefully.
Full Text:
PDFReferences
Ando, S., & Sakamoto, M. (2015). Causes of Income Inequality among the Villages Involuntarily Resettled for the Nam Theun 2 Hydropower Project . Papers on Environmental Information Science, 29, 333-338. (in Japanese)
Fujikura, R., & Nakayama, M. (2013). The long-term impacts of resettlement programmes resulting from dam construction projects in Indonesia, Japan, Laos, Sri Lanka and Turkey: a comparison of land-for-land and cash compensation schemes. International Journal of Water Resources Development, 29(1), 4-13.
Matsumoto, I., & Harashina, Y. (2012). Effects of livelihood restoration plans on dam project: Peoples' livelihoods Changes by the Nam Theun 2 Hydropower Project in Lao PDR. Japan Society for Impact Assessment, 10(2), 65–76. (in Japanese)
Mcdowell, D.K., Scudder, T., & Lee, T.M. (2015). Lao People's Democratic Republic Nam Theun 2 Multipurpose Project: twenty fourth report of the international and social panel of experts. Washington, D.C.: World Bank Group. http://documents.worldbank.org/curated/en/2015/11/25238157/lao-peoples-democratic-republic-nam-theun-2-multipurpose-project-twenty-fourth-report-international-social-panel-experts
NTPC (Nam Theun 2 Power Company) (2005). Nam Theun 2 Social Development Plan: Nakai Plateau and EMDP and RAP. NTPC, Vol. 2, chapter 16. Vientiane: Nam Theun 2 Power Company, Lao PDR.
NTPC (Nam Theun 2 Power Company) (2008). Health Checks and Surveys for Resettled Populations. Vientiane: Nam Theun 2 Power Company, Lao PDR.
NTPC (Nam Theun 2 Power Company). (2014) Nakai Resettlers’ Reality: From the past to the Future. Vientiane: Nam Theun 2 Power Company, Lao PDR.
Porter, I. C., & Shivakumar, J. (2010). Doing a dam better: the Lao People's Democratic Republic and the story of Nam Theun 2 (NT2). Washington, DC: World Bank.
Souksavath, B., & Maekawa, M. (2013). The livelihood reconstruction of resettlers from the Nam Ngum 1 hydropower project in Laos.
International Journal of Water Resources Development, 29(1), 59-70.
Souksavath, B., & Nakayama, M. (2013). Reconstruction of the livelihood of resettlers from the Nam Theun 2 hydropower project in Laos. International Journal of Water Resources Development, 29(1), 71–86.
World Bank (2004). Involuntary Resettlement Source Book – Planning and Implementation in Development Projects. Washington DC: World Bank.
World Bank (2011). Laos - Nam Theun 2 Hydropower Project: Tenth report of the International Advisory Group (IAG): handing over. Washington DC: World Bank.
World Bank (2014). Laos - Nam Theun 2 Multipurpose Development Project: twenty second report of the environmental and social panel of experts. Washington DC: World Bank.
World Commission on Dams (WCD) (2000). Dams and Development: A New Framework for Decision-Making. Earthscan Publications Ltd., London.
DOI: https://doi.org/10.5296/jad.v3i2.11240
Refbacks
- There are currently no refbacks.
Copyright (c) 2017 Journal of Asian Development
Journal of Asian Development ISSN 2377-9594 E-mail: jad@macrothink.org
Copyright © Macrothink Institute
To make sure that you can receive messages from us, please add the 'macrothink.org' domains to your e-mail 'safe list'. If you do not receive e-mail in your 'inbox', please check your 'spam' or 'junk' folder.