Resettlement Caused by Jatigede Dam Project -Consequence of Long Delayed Implementation of a Project

Opan Suhendi Suwartapradja, Ryo Fujikura, Sunardi Sunardi, Regina Hoi Yee Fu

Abstract


Jatigede dam was constructed in Sumedang Regency of West Java Province, Indonesia. It was planned as early as the 1960s. The World Bank cancelled its financing for the reason of insufficient resettlement planning in 1986, but land acquisition for the dam continued and cash compensation was provided to affected villagers. In spite of the suspension of land acquisition in 1997, the Chinese Government became the new sponsor and dam construction started in 2005. Inundation began in 2015 and the villagers were resettled mainly to the vicinity of the reservoir. The construction was completed in 2015. Most of the cash compensation was provided during the mid-1980s. As three decades have passed since the provision of the compensation, resettlers who received the money conceived that the dam construction project has been cancelled. They spent the money at their original place and did not invest for the resettlement. Today, most of the resettlers are jobless and poor. Their incomes are below the international poverty line. Aquaculture at the reservoir is one of the possible options to improve local economy, but the local government prohibits it to avoid deterioration of water quality.


Full Text:

PDF

References


Academic Leadership Grant. (2016). Pemukiman Kembali Orang Terkena Dampak Waduk Jatigede (The Resettlement of People Affected by Jatigede Dam Development) , Faculty of Social and Political Science and Directorate for Research, Community Service and Innovation (DRPMI), Padjajaran University, Indonesia.

Asian Development Bank. (2012). Involuntary Resettlement Safeguards, Asian Development Bank

Bayu, K., Nugraha, D., Kusniadi, E., Nurfadilah, A., & Wisoso A. (2018). An impact analysis of Jatigede dam project affected people on economic , social and culture, Journal of Built Environment, Technology and Engineering, 4, 15-24.

Cernea, M. (1997). Risks, Safeguards and Reconstruction: A Model for Population Displacement and Resettlement, World Development, 25(10), 1569-1587. https://doi.org/10.1016/S0305-750X(97)00054-5

Fujikura, R., & Nakayama, M. (Editor) (2015). Resettlement Policy in Large Development Projects. Routledge, Oxford

Institute of Ecology (IOE). (1992). Analisis Dampak Lingkungan Waduk Serbaguna Jatigede (Environmental Impact Assessment of Jatigede Multipurpose Reservoir). Institute of Ecology, Ministry of Public Works. Bandung, Indonesia.

Institute of Ecology (IOE). (2000). Studi Minat Secara Mengelompok Penduduk Terdampak Waduk Jatigede (Study of People Affected by Jatigede Dam Development). Ministry of Public Works. Bandung, Indonesia.

Karimi, S., & Taifur. (2013). Resettlement and development: a survey of two of Indonesia's Koto Panjang resettlement villages. International Journal of Water Resources Development, 29(1), 35-49. https://doi.org/10.1080/07900627.2012.739539

Moeliono, T. P. (2011). Chapter IX Land Acquisition in the Public Interest: The Jadigete Hydroelectric Powr plant case, Spatial Management in Indonesia: From Planning to Implementation Cases from West Java and Bandung A socio-legal study (Doctor Thesis, Leiden University, pp.283-301).

Nakayama, M. (1998). Post-project Review of Environmental Impact Assessment for Saguling Dam for Involuntary Resettlement, Water Resources Development, 14(2), 217-229. https://doi.org/10.1080/07900629849411

Natahadibrata, N. (2015). Long-awaited Jatigede Dam to start operation in July. The Jakarta Post, June 11, 2015.

Nurulliah, N. (2016) Cages in Jatigede Prohibited, Spreading 10 million Fish (Indonesian). Pikiran Rakyat, 17 February 2016.

OECD Development Assistance Committee. (1992) Guidelines on Aid and Environment, OECD.

Scudder, T. (2005). The Future of Large Dams: Dealing with Social, Environmental, Institutional and Political Costs, Earthscan: London.

Sugiarti, A. L. (2017) The Relationship of the Jatigede Dam Construction towards Socio-Economic Conditions on Farming Community in the District of Jatigede-Sumedang, International Research Journal of Education and Sciences,1(Special Issue 2), 15-20.

Takesada, N. (2009) Japanese Experience of Involuntary Resettlement: Long-Term Consequences of Resettlement for the Construction of the Ikawa Dam, International Journal of Water Resources Development, 25(3), 419-430. https://doi.org/10.1080/07900620902965459

Wiyanti D. T., Suwartapradja O. S., & Nurseto, H. E. (2017) A Success or A Failure: Adaptive Strategy of Affected People in Jatigede Dam Tourism Program, Proceedings of the International Conference on Education, Psychology, and Social Sciences (Volume 4, pp. 256-261).

Wiryawan B. A. (2017). Social Impact of Jatigede Dam construction, IAIA Symposium, Manila 20-22 February 2017.

World Bank. (1982). Report and Recommendation of the President of the Intrnational Bank for Reconstruction and Development to the Executive Directors on a Proposed Loan to the Republic of Indonesia for the Sixteenth Irrigation Project. World Bank.

World Bank. (1989). Project Completion Report, Indonesia Sixteenth Irrigation Report (Loan 2118-IND). World Bank.

World Bank. (2001). Operational Manual, OP 4.12 - Involuntary Resettlement. World Bank.

World Commission on Dams. (2000). Dams and Development – A New Framework for Decision-Making. Earthscan: London.




DOI: https://doi.org/10.5296/jad.v5i1.14422

Refbacks

  • There are currently no refbacks.




Copyright (c) 2019 Journal of Asian Development



Journal of Asian Development  ISSN 2377-9594   E-mail: jad@macrothink.org

Copyright © Macrothink Institute 

To make sure that you can receive messages from us, please add the 'macrothink.org' domains to your e-mail 'safe list'. If you do not receive e-mail in your 'inbox', please check your 'spam' or 'junk' folder.